{"id":6080,"date":"2023-03-20T06:30:59","date_gmt":"2023-03-20T02:30:59","guid":{"rendered":"https:\/\/greentech.re\/project\/swacool-project-finalized\/"},"modified":"2024-04-13T16:27:53","modified_gmt":"2024-04-13T12:27:53","slug":"swacool-project-finalized","status":"publish","type":"project","link":"https:\/\/greentech.re\/en\/project\/swacool-project-finalized\/","title":{"rendered":"SWACool project finalized"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"6080\" class=\"elementor elementor-6080 elementor-4455\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-53d1cec1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"53d1cec1\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-473d4aa\" data-id=\"473d4aa\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-47f4d1a0 elementor-widget elementor-widget-text-editor\" data-id=\"47f4d1a0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Missions :<\/strong><\/p>\n<p>The project focused on the in situ analysis of 4 tertiary buildings in La R\u00e9union and 3 buildings in Marseille (two of which are connected to the Thassalia network) in order to :<\/p>\n<ul>\n<li class=\"western\">gain a better understanding of cooling demand in commercial buildings on Reunion Island<\/li>\n<li>characterize the actual performance of cooling production equipment and the consumption of air-conditioning auxiliaries (production, distribution, emission)<\/li>\n<li>identify the real energy-saving potential of simple actions such as adding a variable speed drive to a distribution pump<\/li>\n<li>compare simulation results using standard parameters for two of the buildings on La R\u00e9union with actual cooling demand profiles measured over the long term.<\/li>\n<li> <\/li>\n<\/ul>\n<p class=\"western\">The 4 sites on La R\u00e9union were selected to cover a wide range of typologies:<\/p>\n<ul>\n<li>hospital (22,000 m\u00b2): P\u00f4le-Femme-M\u00e8re-Enfant (PFME) at CHU Sud in Saint-Pierre<\/li>\n<li>offices (1,260 m\u00b2): Caisse d&#8217;Allocations Familiales (CAF) de Saint-Paul<\/li>\n<li>teaching (1,755 m\u00b2): Fac de Lettres at the Universit\u00e9 de La R\u00e9union in Saint-Denis<\/li>\n<li>SFR datacenter in Le Port.<\/li>\n<\/ul>\n<p class=\"western\">Two of the 3 Marseille sites studied are connected to the Thassalia network (refrigeration machines cooled by water from the Mediterranean Sea):<\/p>\n<ul>\n<li class=\"western\">offices (9,800 m\u00b2): Calypso<\/li>\n<li>hotel (9,500 m\u00b2): Golden Tulip<\/li>\n<li>offices (16,780 m\u00b2): Mirabeau 2 (not connected to the Thassalia network).<\/li>\n<\/ul>\n<p class=\"western\"><strong>Deliverables :<\/strong><\/p>\n<p><em>Task 1: Meeting section<\/em><\/p>\n<ul>\n<li>Deliverable 1.1: <a href=\"https:\/\/greentech.re\/wp-content\/uploads\/2023\/07\/SWACool-Livrable-1.1-Resultats-de-mesure-PFME-St-Pierre-Green-Tech-sept-2020.pdf\" target=\"_blank\" rel=\"noopener\">P\u00f4le-Femme-M\u00e8re-Enfant (PFME) Saint-Pierre case study<\/a><\/li>\n<li>Deliverable 1.2: Case study of CAF Saint-Paul<br \/>&#8211; 1.2a: <a href=\"https:\/\/greentech.re\/wp-content\/uploads\/2023\/07\/SWACool-Livrable-1.2a-Resultats-de-mesure-CAF-St-Paul-Green-Tech-sept-2020.pdf\" target=\"_blank\" rel=\"noopener\">Measurement results<\/a><br \/>&#8211; 1.2b: <a href=\"https:\/\/greentech.re\/wp-content\/uploads\/2023\/07\/SWACool-Livrable-1.2b-Resultats-de-simulation-CAF-St-Paul-LEU-Reunion-sept-2020.pdf\" target=\"_blank\" rel=\"noopener\">Thermal simulation results<\/a><\/li>\n<li>Deliverable 1.3: Case study of Fac de lettres Saint-Denis<br \/>&#8211; 1.3a: <a href=\"https:\/\/greentech.re\/wp-content\/uploads\/2023\/07\/SWACool-Livrable-1.3a-Resultats-de-mesure-Fac-de-lettres-St-Denis-Green-Tech-sept-2020.pdf\" target=\"_blank\" rel=\"noopener\">Measurement results<\/a><br \/>&#8211; 1.3b: <a href=\"https:\/\/greentech.re\/wp-content\/uploads\/2023\/07\/SWACool-Livrable-1.3b-Resultats-de-simulation-Fac-de-lettres-St-Denis-LEU-Reunion-sept-2020.pdf\" target=\"_blank\" rel=\"noopener\">Thermal simulation results<\/a><\/li>\n<li>Deliverable 1.4: SFR Le Port datacenter case study (CONFIDENTIAL)<\/li>\n<\/ul>\n<p class=\"western\"><em>Task 2: Metropolitan area (Thassalia network in Marseille)<\/em><\/p>\n<ul>\n<li>Deliverable 2.1: <a href=\"https:\/\/greentech.re\/wp-content\/uploads\/2023\/07\/SWACool-Livrable-2.1-Resultats-de-mesure-Calypso-Enertech-mars-2020.pdf\" target=\"_blank\" rel=\"noopener\">Calypso building case study<\/a><\/li>\n<li>Deliverable 2.2: <a href=\"https:\/\/greentech.re\/wp-content\/uploads\/2023\/07\/SWACool-Livrable-2.2-Resultats-de-mesure-Golden-Tulip-Enertech-avril-2020.pdf\" target=\"_blank\" rel=\"noopener\">Case study of the Golden Tulip building<\/a><\/li>\n<li>Deliverable 2.3: <a href=\"https:\/\/greentech.re\/wp-content\/uploads\/2023\/07\/SWACool-Livrable-2.3-Resultats-de-mesure-Mirabeau-2-Enertech-mai-2020.pdf\" target=\"_blank\" rel=\"noopener\">Mirabeau 2 building case<\/a> study<\/li>\n<\/ul>\n<p class=\"western\"><em>Task 3: Learning from the project<\/em><\/p>\n<ul>\n<li class=\"western\">Deliverable 3.1: <a href=\"https:\/\/greentech.re\/wp-content\/uploads\/2023\/07\/SWACool-Livrable-3.1-Synthese-des-enseignements-Reunion-Green-Tech-sept-2020.pdf\" target=\"_blank\" rel=\"noopener\">Feedback on air-conditioning systems in the 4 commercial buildings studied on Reunion<\/a> Island<\/li>\n<li>Deliverable 3.2: <a href=\"https:\/\/greentech.re\/wp-content\/uploads\/2023\/07\/SWACool-Livrable-3.2-Synthese-des-enseignements-Marseille-Enertech-sept-2020.pdf\" target=\"_blank\" rel=\"noopener\">Feedback on air-conditioning systems in the 3 commercial buildings studied in Marseille<\/a><\/li>\n<\/ul>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"featured_media":5690,"parent":0,"template":"","project_cat":[66],"class_list":["post-6080","project","type-project","status-publish","has-post-thumbnail","hentry","project_cat-other"],"acf":[],"_links":{"self":[{"href":"https:\/\/greentech.re\/en\/wp-json\/wp\/v2\/project\/6080","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greentech.re\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/greentech.re\/en\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":1,"href":"https:\/\/greentech.re\/en\/wp-json\/wp\/v2\/project\/6080\/revisions"}],"predecessor-version":[{"id":6082,"href":"https:\/\/greentech.re\/en\/wp-json\/wp\/v2\/project\/6080\/revisions\/6082"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/greentech.re\/en\/wp-json\/wp\/v2\/media\/5690"}],"wp:attachment":[{"href":"https:\/\/greentech.re\/en\/wp-json\/wp\/v2\/media?parent=6080"}],"wp:term":[{"taxonomy":"project_cat","embeddable":true,"href":"https:\/\/greentech.re\/en\/wp-json\/wp\/v2\/project_cat?post=6080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}